Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 9 results ...

Collins, A, Blondel, A A, Mensah, S and Manu, E (2021) Assessing the cost of competitive tendering in Ghana using transaction cost theory. Built Environment Project and Asset Management, 11(5), 835-50.

Hemalattha, S and Vidjeapriya, R (2021) Developing an integrated framework for optimization of spatial requirements of construction equipment. Built Environment Project and Asset Management, 11(5), 903-17.

Julayhe, N and Rahman, M M (2021) Dwellers' perception on challenges and motivators of greening existing buildings in Brunei Darussalam. Built Environment Project and Asset Management, 11(5), 870-87.

Ofori, G, Zhang, Z and Ling, F Y Y (2021) Initiatives that enable Singapore contractors to improve construction productivity. Built Environment Project and Asset Management, 11(5), 785-803.

Olatunde, N A and Odeyinka, H A (2021) Extent of stakeholder management practices in building projects procured by private corporate organisations in Nigeria. Built Environment Project and Asset Management, 11(5), 819-34.

Oluwole, A O, Jane Jia Suen, L, Heap-Yih, C and Akanmu, A A (2021) Building information modelling penetration in quantity surveying practice. Built Environment Project and Asset Management, 11(5), 888-902.

  • Type: Journal Article
  • Keywords: building information modelling; design model; quantity surveying practice; standard method of measurement; collaboration; costs; design; building management systems; interoperability
  • ISBN/ISSN:
  • URL: http://dx.doi.org/10.1108/BEPAM-08-2020-0140
  • Abstract:
    This study investigates building information modelling (BIM) penetration in quantity surveying (QS) practice by examining the significance attached to the benefits and barriers of BIM adoption, BIM capabilities and future directions of BIM in QS processes. A popular opinion amongst construction researchers is that BIM has the capacity to revolutionize the industry. The study draws-out information in the literature regarding discipline-specific penetration of BIM. Snowball sampling method was used to obtain information through a survey questionnaire. A total of 73 participants, largely quantity surveyors in Western Australia, took part in the study. Reductionist methodology was used to identify key variables of QS-BIM competencies that are most significant statistically. BIM does not impose additional difficulties to traditional QS processes. Adherence to standard method of measurement and limited market demand do not hinder BIM deployment significantly. Quantity surveyors are able to use BIM to support their professional services once definitive design models are involved. In addition, the study identifies BIM penetration barriers to include constraints caused by centralised database management and interoperability issues, limitations imposed by market drivers, lack of in-house expertise to manage modelling needs and limited capability in software management. Future opportunities for skill development are in the areas noted in the findings. Whilst many studies have reported resistance and widespread scepticism amongst some construction disciplines regarding BIM adoption, this study finds BIM penetration in QS practice is considerable, a direction that could trigger further novel innovations. The methodology reported in the study is novel. In addition, findings from the study inspires other discipline-specific studies to articulate their BIM-penetration trends so that t broad areas of construction can develop a balanced strategy around BIM and innovation development.

Sambo Lyson, Z, Mwansa, C and Zulu, E (2021) Perceptions and beliefs influencing intention to use solar energy solutions in Zambian households. Built Environment Project and Asset Management, 11(5), 918-33.

Tuan Son, N, Sherif, M and Mostafa, S (2021) Project stakeholder's engagement and performance: a comparison between complex and non-complex projects using SEM. Built Environment Project and Asset Management, 11(5), 804-18.

Wanigarathna, N, Sherratt, F, Price, A D F and Austin, S (2021) Sources and flow of healthcare built environment design evidence. Built Environment Project and Asset Management, 11(5), 851-69.